Appendix 2: Facts and route map

  • Vyborg, Russia – Greifswald, Germany
  • Approx. 1,220 km long – 2 parallel pipelines
  • 27.5 bcm annual capacity each
  • 55 bcm total capacity per year
  • 2011 – planned commissioning of first pipeline
  • 2012 – planned commissioning of second pipeline
  • 1,220 mm pipeline diameter
  • 220 bar design pressure
  • Planned investment: 7.4 billion Euro
  • Will meet about 25% of the growth in Europe’s gas import needs between 2005 and 2025.

Source: http://www.nord-stream.com/fileadmin/Dokumente/NORD_STREAM__FACTS/English/NORD_STREAM_FACTS_ISSUE_0_ENGLISH_DOWNLOAD.pdf