Comprehensive Logistics Management in Defence

Volume:4
Issue:3
Perspectives

The RFP should define the sustained capability required for a defined period of time. It should ask the vendors to give technical and commercial proposals for owning and exploiting the same as per the defined usage at a specified level of operational readiness. The provisions for defence offset should be leveraged for setting up the necessary JVs to provide life time training, maintenance and logistic support in accordance with the principles of PBL. In case any existing infrastructure could be made available to him, its details and lease arrangements should also be specified.

Attachment
Download Complete [PDF]